Guides · Remodelling

Remodelling a house in Switzerland: costs and process

A remodel never starts with drawings. It starts with the question of how you want to live in ten years — and how much of that your house can deliver.

Remodelled house, hamlet conversion project
Hamlet conversion in Wagen SG — our own project (2025).

This article is the overview: what a remodel costs, in what order the decisions are made and how the project runs. For the individual topics — from the attic to the extension to the building permit — you will find dedicated, in-depth guides here.

What does a house remodel cost?

The ranges by scope, based on the affected living area:

ScopeTypical workGuide price per m²
Light remodelReorganising rooms, surfaces, individual wallsCHF 500 to 1,200
Full remodelNew floor plan, bathroom and kitchen, building servicesCHF 1,200 to 2,500
Remodel with extensionPlus an extension, an added storey or an attic conversionproject-dependent, see the in-depth guides

Plus the iron rule: 10 to 15 percent contingency. And the second, less known one: the cheapest remodelling idea is often the one that uses rooms differently instead of moving walls. A good design saves more money than any round of cuts on materials.

The right order of decisions

  1. What should the house do for you? Number of rooms, home office, ageing in place, maybe a granny flat. Programme first, then the plan.
  2. What can the building fabric take? Structure, pipes and wiring, moisture, hazardous materials — the condition survey. With older houses there is no way around it: see Renovating an old house.
  3. What does planning law allow? Zoning, utilization ratio, core zone, possibly a heritage inventory. Checking costs little and prevents planning into a dead end: see Building permits in the Canton of Zurich.
  4. What is it allowed to cost? An honest budget including contingency — and financing settled early with your bank, since value-adding investments can often be financed through the mortgage.
Chart: the remodelling process in six steps
From condition survey to final acceptance — the same rhythm as any renovation.

The in-depth guides on each topic

Bright interior after the remodel, hamlet project
The result of the right order: rooms that fit your life. Our own project, Wagen SG.

Frequently asked questions

How long does a house remodel take?

Light remodels: two to four months of construction. Full remodels: four to eight. Add six to twelve months beforehand for planning and permits — the phase in which everything gets decided.

Remodel, or sell and buy new?

Run both numbers honestly: selling costs you property gains tax (Grundstückgewinnsteuer), transfer fees and the move, and when buying new you pay for the location all over again. The remodel usually wins — unless the house fundamentally no longer fits your life.

Can I live in the house during the remodel?

During a light remodel, yes — in stages. During a full remodel it gets rough: dust, water off, power off. Temporary accommodation usually costs less than a construction site that has to tiptoe around you.

Thinking about remodelling your house?

I put programme, building fabric and budget in the right order — before the first wall comes down. The first consultation is free and without obligation.

More: How the first conversation works · See built projects